Chapter 17
17Closing the Loop with the Lab
17.1The design-build-test-learn cycle
Planned: The model proposes, the lab tests, the results feed back.
17.2Active learning and iteration
Planned: Choosing the next experiment when experiments are the expensive resource.
17.3Delivering into a pipeline
Planned: Working with wet-lab partners; predictions that a lab can actually act on.